All-Internet Protocol
Contents |
[edit] Introduction
All-Internet Protocol (or All-IP) is a term that describes the fibre optic based networks designed to replace copper-based public switched telephone networks (PSTN).
[edit] What is IP
IP is a type of language or code that Internet-connected technology uses to communicate. It determines the parameters for data transfers based on protocols that regulate things such as network packet size. (A packet is a small amount of data that is sent over networks.)
Equipment and services that work over the Internet via IP are designed to operate at faster connection speeds and with better functionality between technologies. This is also intended to streamline operational platforms and other digital communications services.
Internet-connected technology such as Voice over Internet Protocol - or VoIP - is one example of how this type of communication has been used by customers to make voice calls over the Internet. VoIP services such as Skype, Microsoft Teams and FaceTime reflect how All-IP services will operate.
[edit] All-IP integration
In the UK, the switch from PSTN to All-IP began in the summer of 2021. The transition should be complete by 31 December 2025, by which time analogue networks will be decommissioned and users will be transferred from traditional copper phone lines to All-IP digital networks. By that time, communications providers (CPs) will have migrated customers to full fibre (fibre to the premises or FTTP) or part fibre (Single order Generic Ethernet Access or SoGEA) networks.
Customers will then use digital lines for all telephony and related services. This means devices and services will be required to operate through a suitable router. This applies not only to telephones, but anything that plugs into analogue wall sockets, including security alarms, smoke detectors, life safety equipment and other interconnected devices. After the All-IP migration is complete, these sockets will only provide access to the Internet or may cease to operate entirely.
Services to be withdrawn include:
- Wholesale Line Rental (WLR).
- Integrated Services Digital Network (ISDN) including ISDN2 and ISDN30.
- Fibre to the Cabinet (FTTC).
- Metallic Path facility (MPF).
- Local Loop Unbundling Shared Metallic Path Facility (LLU SMPF).
- Sub-Loop Unbundling Shared Metallic Path Facility (SLU SMPF).
Customers are urged to conduct inventory checks before 31 December 2025 to take stock of devices that use analogue lines. These devices will need to be replaced by those that can operate digitally over All-IP networks.
[edit] Related articles on Designing Buildings
- BSRIA expects fast growth in Power over Ethernet applications.
- Convergence and big data, The impact on structured cabling.
- Developing system intelligence for optimising building electricity networks.
- Electrotechnical industry gears up for All-IP switch.
- Power over ethernet.
[edit] External resources
Featured articles and news
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The remarkable story of a Highland architect.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.
A new CIOB TIS on discharging CDM 2015 duties
Practical steps that can be undertaken in the Management of Contractors to discharge the relevant CDM 2015 duties.
Planning for homes by transport hubs
Next steps for infrastructure following the updated NPPF.
Access, history and Ty unnos.
The world’s first publicly funded civic park.
Exploring permitted development rights for change of use
Discussing lesser known classes M, N, P, PA and L.
CIOB Art of Building photo contest 2024 winners
Fresco School by Roman Robroek and Once Upon a Pass by Liam Man.